For training dogs on recall, or allowing dogs a roam in the park, or the beach, while still maintaining lead control.Folds neatly to hang conveniently from belt loop when not in use.Medium Snap HookSIZE: 19mm wide; 5 metres long
For training dogs on recall, or allowing dogs a roam in the park, or the beach, while still maintaining lead control.
Folds neatly to hang conveniently from belt loop when not in use.
Medium Snap Hook
SIZE: 19mm wide; 5 metres long
Reviews
There are no reviews yet.